Effect of Adding Progressive Muscle Relaxation to Physical Therapy Program on Fatigue, Mobility and Stress Among Individuals With Traumatic Lower Limb Amputation in the Gaza Strip
For patients and families
In plain language
An automatic summary of structured registry data. It is an orientation aid, not a substitute for the official protocol or a physician assessment.
- What is being studied
- The protocol lists: Progressive Muscle Relaxation + Standard Physiotherapy, Standard Physiotherapy.
- Who it may be relevant to
- Registry conditions: Traumatic Lower Limb Amputation, Fatigue, Mobility Impairment, Psychological Stress. Basic parameters: 18 years — 59 years · All.
- What needs checking
- Age, condition and sex are only basic indicators. Prior treatment, laboratory values and other mandatory requirements appear in the eligibility criteria below.
- Where it takes place
- Palestinian Territories
- Next step
- Save the trial, show it to the treating physician, and confirm current recruitment with the study center. Costs, documents and travel →
Unsure about the terms? Read our patient guide →
Official title
Effect of Adding Progressive Muscle Relaxation to Physical Therapy Program on Fatigue, Mobility and Stress Among Traumatic Lower Limb Amputees in Gaza Strip
Overview
Lower limb amputation is a life-altering condition with profound physical and psychological consequences, including fatigue, impaired mobility, stress, and asymmetrical weight-bearing. These challenges are particularly severe in conflict-affected settings like the Gaza Strip, where access to rehabilitation services is limited. This study aims to evaluates the effect of adding Progressive Muscle Relaxation (PMR), a simple and cost-effective relaxation technique, to standard physical therapy on Fatigue, mobility, weightbearing distribution and stress outcomes among adults with unilateral traumatic lower limb amputation in Gaza. Study design: RCT with 60 participants will be randomly assigned to either (1) a control group receiving standard physiotherapy or (2) an intervention group receiving standard physiotherapy plus PMR. Outcomes will be measured using validated instruments: Fatigue Severity Scale (FSS), 2-Minute Walk Test (2MWT), Perceived Stress Scale (PSS-10), and dual bathroom scale method for weight-bearing distribution. Assessments will be conducted at baseline, post-intervention (6 weeks), and follow-up (8 weeks). The study aims to determine whether integrating PMR into rehabilitation improves fatigue reduction, functional mobility, stress management, and weight-bearing symmetry compared to physiotherapy alone. Findings will contribute to evidence-based rehabilitation strategies for amputees in low-resource, high-stress environments.
Detailed description
This study protocol addresses the multidimensional challenges faced by individuals with traumatic lower limb amputation in the Gaza Strip, a conflict-affected region with limited access to rehabilitation. Amputees often experience persistent fatigue, impaired mobility, asymmetrical weight-bearing, and high psychological distress. Standard physical therapy primarily focuses on physical recovery, while psychosocial rehabilitation is often overlooked.
Rationale:
Progressive Muscle Relaxation (PMR) is a structured mind-body technique that systematically tenses and relaxes muscle groups to reduce stress and physical tension. Evidence from other populations, including patients with cancer, chronic illnesses, and stroke, has shown PMR to be effective in reducing fatigue, anxiety, stress, and improving functional performance. However, its use in amputee rehabilitation-particularly in conflict settings-remains underexplored.
Study Objectives:
General Objective: To evaluate the effect of integrating PMR with physiotherapy program on Fatigue, mobility, weightbearing distribution and stress among individuals with traumatic lower limb amputation.
Study Design:
Randomized controlled trial (RCT) with 60 participants allocated to intervention (PMR + physiotherapy) or control (physiotherapy alone) groups using block randomization and concealed allocation.
Outcome Measures:
Fatigue (FSS), mobility (2MWT), Stress (PSS-10), weight-bearing symmetry (dual scale method).
Assessment Timeline: Baseline (week 0), post-intervention (week 6), and follow-up (week 8).
Sample Size: 60 participants (30 per group), based on power analysis accounting for attrition.
Data Analysis: Descriptive statistics, paired t-tests, independent t-tests, and repeated-measures ANOVA. Intention-to-treat analysis will be applied.
Ethics: Approval is obtained from the Helsinki Committee and the Artificial Limbs and Polio Center (ALPC). Informed consent will be secured, confidentiality maintained, and adverse events monitored.
Expected Impact:
This study will provide the first randomized evidence on the effectiveness of PMR in traumatic amputee rehabilitation within Gaza. It is expected that adding PMR to physiotherapy will significantly reduce fatigue and stress, improve mobility, and enhance weight-bearing symmetry compared to physiotherapy alone. Results will inform rehabilitation protocols in low-resource, conflict-affected settings and may guide future policy and practice for amputee care.
Interventions
- Behavioral Progressive Muscle Relaxation + Standard Physiotherapy
Standard physiotherapy exercises plus PMR sessions. PMR is gradually transitioned from therapist-guided to self-directed practice across the 6 weeks. - Behavioral Standard Physiotherapy
Participants receive a 6-week standard physiotherapy program delivered twice weekly. Sessions include warm-up, weight-bearing training, balance exercises, gait training, and functional activities. The protocol focuses on improving mobility, weight-bearing capacity, balance, and functional independence. No Progressive Muscle Relaxation or additional behavioral techniques are included.
Primary outcome measures
- Fatigue Level [Time frame: Baseline, 6 weeks post-intervention and 8 weeks follow up]
- Mobility [Time frame: Baseline, 6 weeks post-intervention and 8 weeks Follow up]
- Stress Level [Time frame: Baseline, 6 weeks post-intervention and 8 weeks following]
- Weight-Bearing distribution [Time frame: Baseline, 6 weeks post-intervention and 8 weeks following]
Eligibility criteria
Inclusion criteria
- Adults aged 18 to 59 years.
- Unilateral traumatic trans-femoral/transtibial amputation.
- Post prosthetic fitting.
Exclusion criteria
- Severe comorbidities (e.g., uncontrolled cardiovascular disease).
- Severe cognitive impairment or mental illness.
- Recent orthopaedic surgery (<3 months)
Criteria are shown verbatim from the registry (in English). Final eligibility is always assessed by the study center.
Healthy volunteers: No
Study design
- Allocation
- Randomized
- Model
- Parallel assignment
- Masking
- Single blind
- Primary purpose
- Treatment
Study locations
Palestinian Territories · 1 center
- Artificial Limb & Polio Center (ALPC), Gaza — Gaza
Identifiers
NCT: NCT07139145 · PHRC/HC/1251/25